From launch 1 all the way through the break run is at full speed give or take the wheels. They are still tinkering with launch # 3 though.
I hope they make it as fast as possible.
From launch 1 all the way through the break run is at full speed give or take the wheels. They are still tinkering with launch # 3 though.
I continue to be amazed at how great this coaster looks going around the track. Can't wait to see it in person.
aww Kasi is so adorable on leno
^ Coasters always look slower than they feel, Hulk feels like more than 40mph.
That would mean that they would have to test it for 125 days 24/7. Did you mean 300?i think they have to run 3000 hours of testing
That would mean that they would have to test it for 125 days 24/7. Did you mean 300?
Something that really hasn't been discussed yet is the queue. I know it will feature the large Cheetah Rock, but what else will it look like? Does anyone know if it is walled up? Or is it just the same open pathway as before?
UPDATE: The Cheetah Hunt sign is being installed!
http://lockerz.com/s/100791411
Something that really hasn't been discussed yet is the queue. I know it will feature the large Cheetah Rock, but what else will it look like? Does anyone know if it is walled up? Or is it just the same open pathway as before?
UPDATE: The Cheetah Hunt sign is being installed!
http://lockerz.com/s/100791411