Perfect!View attachment 7256
How's that for a waterfall?
Planet Coaster really has gone off the rails with their DLC'sView attachment 7256
How's that for a waterfall?
I don't think it will look that intense, but that sure is cool
The 41-ton steel, 67 ft tower took crews five nights to install. The innovative vertical lift is designed to transport the rafts to the top of the ride’s 40-foot drop in just over five seconds. The park plans to announce an opening date in the coming weeks.
Infinity Falls at SeaWorld Orlando “topped off” as construction wraps up | Inside Universal
I'm guessing the bridge is where the regular line starts.
SHOCK! Intamin never has any problems when they build an attraction...Anybody see the latest Midway Mayhem? Testing has severely stalled out and it seems there may be issues with the lift.
Intamin!
Hm good point but they didn't do that with Gringotts so I doubt they just made a second lift/drop just in case. I'm guessing that's show scene length.
Though the idea of spending that much money on Intamin insurance is pretty hilarious.
I’m getting Falcon’s Fury flashbacks. That’s not good.
Yeah, that wasn't good, ironically, FF is down right now...I hope they can get this open before it gets colder...It was cold in October this yearI’m getting Falcon’s Fury flashbacks. That’s not good.