Jurassic World: The Ride Construction Thread | Page 71 | Inside Universal Forums

Jurassic World: The Ride Construction Thread

  • Signing up for a Premium Membership is a donation to help Inside Universal maintain costs and offers an ad-free experience on the forum. Learn more about it here.
Status
Not open for further replies.
From JPLand, some more angles.



Also as a note from the two before; the thatched roofing for the bar is now going up, alongside with the rocks around the surrounding area finally getting their proper paint jobs. It's also good to see that more of the new paint on the Outfitters portion of the area, is also being worked on.

Also, in one of the shots; you can see the final coating being tested on one of the rocks.

upload_2019-5-23_4-22-44.png

Edit: Also, they have begun to add the signage for the area; starting with the bar.

upload_2019-5-23_5-29-17.png
 
Last edited:
Getting hyped! Love the idea of having a bar in that spot. If they set it up with some tables and everything, it will be a great place to enjoy the sun and relax while watching people come down the chute. I’ve heard it’s going to be tiki-themed, any chance that’s true?
 
Interesting.

Liking the details about the Mosasaurus enclosure and how it will change to match current outside weather conditions/time of day.

Was wondering what they might do to reduce the inside to outside issue.

I’m glad parks are finally doing this. They are doing this on Smugglers Run also, day and night version.
 
The description of the Mosasaurus scene is hilarious. Depicting the size and volume of the aquarium (screen) portion of the ride :lol:
 
  • Like
Reactions: Coolbfitz
Status
Not open for further replies.