Can someone draw a line connecting the two? It'll hold me over til Tuesday lol
Finally! I've been wondering when they would start to assemble the outerbank. Also, calling it now, we're gonna have this open before the end of March.https://www.reddit.com/r/rollercoasters/comments/e1l9hq/iron_gwazi_weeklyish_aerial_update_112519_top_of/?utm_source=share&utm_medium=ios_app&utm_name=iossmfView attachment 11241
Crest of the lift hill is assembled on the ground, waiting to be put into place. Also, first element (Zadra like turn) is starting to rise.
Need. Photos. NOW.Just pulled into the front entrance of the park. Holy SH!T this thing is TOWERING over Cheetah Hunt and the front entrance.
I got a ton don’t worry. I’ll post a couple in a few hours.Need. Photos. NOW.![]()
Jesus Christ lord and savior.Slatt++
*heavy breathing*
WE'RE TOPPED OFF!
Push me over it, neeeow!!!! That drop is gonna be bonkers!
WE'RE TOPPED OFF!