Jurassic Park Expansion/New Coaster

Scott W.

Premium Member
Feb 26, 2014
11,681
Glasgow
But if they’re empty for 2 1/2 months?
True but concrete can only settle so fast and even if they manage to breeze through track installation a few months ahead of schedule, there is still a schedule and the next parts for installation might not be ahead of schedule and they might be working with reduced labour.
 
  • Like
Reactions: Grabnar

Alicia

Premium Member
Jul 17, 2014
9,284
Orlando
What is that red wall? I see it blocks the view of the building but it seems itll go into the area of where guests will walk
It’s separating the raptor encounter from the restaurant area. The Raptor Encounter exit will probably be along it. (Not through it.)
 

Joe

aka TestTrack321
Staff member
Moderator
Feb 15, 2012
11,668
Pittsburgh, PA
The timing of this attraction's opening has little to do with how fast it could've been/could be built.
Such as mandatory shut downs by contractors making prefab rockwork, Intamin and Mack not being able to enter the country for testing, etc etc
 

Tyc00n96

Rookie
Aug 1, 2015
405
Miami
Watching the Lost World and I kinda wish the coaster area would be themed to the raptor den from the movie. It has electric fences, watch tower, worn down buildings and other elements that would be very different from anything in the park look wise
 

shiekra38

Veteran Member
Dec 13, 2009
9,926
Florida
Watching the Lost World and I kinda wish the coaster area would be themed to the raptor den from the movie. It has electric fences, watch tower, worn down buildings and other elements that would be very different from anything in the park look wise
Wait, isn't that what we're getting?
 

VolcanoAye

Member
Sep 15, 2019
681
Love this image (Thanks alicia!) but a little confused. the extended queue looks surprisingly thin, but i’m having trouble imagining it to scale. does anyone know another extended queue it could be compared to?8ECD3B41-4CAB-44BA-9E34-2C4B4A7CC334.jpeg