There's plenty of areas DHS can expand, although i'm not actually sure the one shown is something that could be used for expansion.
Remember, SWL was originally going to go into the parking lot, so that space still exists, there's a plot behind BatB and there's the space between RNRC and Animation (which would include demoing Animation, which has a lot of wasted space/old office buildings).