The Alien Saucer ride will be around 1200, too. Maters is 600/hour, but this ride is a dueling ride like MK's Dumbo, so it has double capacity.
That leaves the coaster, which I have to think will be fairly low as well, no more than 1200 i'd say (based on what I looked up on the Vekoma website). So the land will have severe capacity issues.