One thing that I really like out of this project, like TSL or not, is that the TSMM entrance is switching sides. To me, having that entrance right in such a narrow area between the giant GMR Show Building and the soundstages on the other side was just awkward.
While TSL may not interest most here, it will at least be a much more open path (to get to SWL

)