There is still some demo'd gap between the new molding/edging they just put on.
They're either overlooking it, which means they'd need to fill and then repaint;
or they're going to go over it with a faux stone facade. I know
@Alicia was thinking they may do flagstone, similar to that on the left of this picture.
I still don't know if that flagstone look will work. I'm guessing they'll do the same type of stone that is on the Abbey.
The other option would be that when they put the pre-molded section back up and fill in the gaps there, they will also fill in the gaps on the edging and hand-paint at that point. That seems less likely though.