Theme Park Insider confirms B&M is doing the rebuild.
Yes, Bolliger & Mabillard is Building the New Hulk Coaster at Universal Orlando
LOOKS LIKE SINISTER THINGS RAN AFOOT IN OTHER DIRECTIONS
Theme Park Insider confirms B&M is doing the rebuild.
Yes, Bolliger & Mabillard is Building the New Hulk Coaster at Universal Orlando
LOOKS LIKE SINISTER THINGS RAN AFOOT IN OTHER DIRECTIONS
Sinister? What do you mean?
The way the rumor was shared on Screamscape.
Disturbing Information About The Incredible Hulk Renovation Leaks Out
They couldn't tell me who would be behind the rebuilt version, or even if it would still even resemble old Hulk layout or not anymore, but apparently something sinister is afoot.
Wasn't a fan on how the rumor was conveyed.
This. Second half of that coaster is whackyI think the second part of the ride might have minor alterations, which would make sense since it always felt like something was flawed in the design there.
Lot of work but also the potential for better space usage and creating additional space.I'd get rid of Doom too and do something with that space...for a landlocked park that potentially opens a space for 2 massive new marvel attractions
Personally I think the second half of the ride is very forgettable...whereas coasters like Kumba and Kraken maintain my interest until the very end.
Yeah im gonna cry..If that loop comes down it'll blow my mind.
Yeah im gonna cry..
It looks as if that's going to happen..I won't believe it until I see it. I mean in just a month and a few days they took out the back half of the ride. They have another 8 months of refurb to go so very possible.It might be rebuilt inch for inch, but this is still unprecedented if they replaced ALL the track.
The footers are being ripped up from the earth...