Bio posted a bunch of new photos of the Surf Coaster construction.
Interesting that it appears there's just going to be a single track for the storage shed. I'm guessing that means they're only getting two trains?
I assume we're looking at the brake run alongside the train shed, transfer tracks, curve into the station (under construction), and then straight into the launch track.