Okay, here's my video from the other day, when I finally caught a glimpse of a vehicle test. It was marked as R/V #3 by the way. So maybe they are testing each vehicle individually day by day. I also got video of the food stand almost ready for guests. My guess is most of the construction walls will come down and the stands will open long before the ride actually does. And I saw crew hanging hair-like things on stakes and painting/weather-proofing the bamboo that had been covered in plastic near the entrance for so long. Check out the video and a few screenshots below and lots more
here.
Notice the black hair tied around the stakes?
Flowing in the wind, creepily.
Here's a worker grabbing a handful of it from a pile of hair on the ground.
Big 'ol pile of fake hair
Can't wait to see this place properly lit up at night!
You think they're gonna make an attempt to hide these things in the mouth?
I assume they're LEDs? Look awkward just laying in there.
Lots of spots brought in everywhere.
Not so subtle speaker
Roots and cave-like rockwork visible inside opening where RVs come out after load
Soon.
That's all for now. More images
here!