There's not goin to be a rope bridge on the volcano. That's going on the queue for the purple slide where you drop into the pool
CorrectThere's not goin to be a rope bridge on the volcano. That's going on the queue for the purple slide where you drop into the pool
There is no rope bridge on the backside of the volcano. Based on the concept videos, it looks like it is actually just a walkway/platform.
View attachment 3614 View attachment 3615 View attachment 3616
I'm confused about something. Will VB be part of your annual pass or do you need to buy a separate ticket?
Very disappointed that the stairway for the drop slides is located OUTSIDE the Volcano. Could've been so much cooler built up and around the interior of the Volcano...bubbling magma, lava trickling down...talk about a missed opportunity.
What color will those two slides in the opening be?
There is no rope bridge on the backside of the volcano. Based on the concept videos, it looks like it is actually just a walkway/platform.
View attachment 3614 View attachment 3615 View attachment 3616
Very disappointed that the stairway for the drop slides is located OUTSIDE the Volcano. Could've been so much cooler built up and around the interior of the Volcano...bubbling magma, lava trickling down...talk about a missed opportunity.
Scared of what?
What if I told you guys that one contractor hasn't been given access to the site yet. And is starting to become very concerned about the completion date.
There is not much more to add. One of the contractors that is supposed to be building some of the elements hasn't been allowed on site yet. And the project lead from that company is very concerned about getting done with everything they need to do before opening day.I'd say, "tell me more"
What if I told you guys that one contractor hasn't been given access to the site yet. And is starting to become very concerned about the completion date.
There is not much more to add. One of the contractors that is supposed to be building some of the elements hasn't been allowed on site yet. And the project lead from that company is very concerned about getting done with everything they need to do before opening day.
I think we all are concerned about it...Just looking at how much work there is still to be done makes my heart race
I'd tell you I believe you. I thought the May opening was ambitious anyway.Interesting.What if I told you guys that one contractor hasn't been given access to the site yet. And is starting to become very concerned about the completion date.
I keep having mixed emotions. Some days I feel like they are in danger of hitting the deadline and other days I feel like they are going to come in on time. They have 2 months and 3 weeks left before the full opening. I think they can do this !