My guess is that the perimeter slides open with the park on Thursday and that the volcano slides (drop slides, mat slides, water coaster) open at a later date. Also can't see the action river being open considering that it goes right through the construction zone.
@Teebin, do you think the dried out bamboo that they've been planting is salvageable? When they did landscaping work for the TM garage and Cabana Bay, I don't remember any of the plants looking as dry as the VBay ones do. I know we're in a drought but are they even going to survive at this point?