Three things
1. Awesome update Roodles!
2. Alton are the masters of sight lines regardless of restrictions
3. Are they trying to make people vomit with that art work on top of the layout of this thing?!!?
That optical illusions art work plus a mimimum 14 inversions could indeed be asking for trouble:ack:. Maybe they will have paper bagsin the hold :rofl:
- - - Updated - - -
Latest construction update.
Spent the day on site today, got a good ride count but an even better construction photo count, below are just a few of the 146 I took today.
As already reported the first leg of the marmaliser went in today, below is the story of how it was installed.
Plans for fixing the legs in place.
And a bit closer
Starting the lift
Marmaliser LED screens
Marmaliser in place
Fixing into place
Leg on the move
Putting into position
Marmaliser leg bracket
begining the lift of the second part of the leg
Side view
Fixing to the body
Waiting to fit onto the first section
Fixing the leg into position
Marmaliser body and first leg in place
Footer for next leg and possible themeing part?
No track was installed today but it is installed all the way upto the top end of site (except for the near side airtime hill) as the marmaliser was in the way, unti today. Ground works were in full force with diggers shifting tonnes of earth, footers being placed and concrete was being poured.
Track all the way up to the top end of site
Concrete was being pumped onsite for most of the day
Nearly ready for the lift hill
Other random construction pics
Mainatenance shed and station in the background
More of the walls are complete and marmailser parts in the foreground
Close up of the walls
I counted 20ish track pieces in the car park, only 3 of those were straight pieces and I presumed these to be maintenance building track. There is still no sign of any lift hills.