I do kind of get the feeling it seems different this time. The blocking system and control issues with this will likely be harder to fix than mechanical / show sync issues with a regular dark ride like FJ without the coaster aspects. Enough normal coasters with complex block setups have these kinds of problems, before you even add in all the other things such as the dark ride elements which have to combine with it as well. To use one very similar example, the Gerstlauer Eurofighter 'Saw' at Thorpe Park had massive block issues when it first opened, similar to those going on with Gringotts by the look of things. It suffered thanks to having dual onload, dual offload, and multiple MCBRs, which all combined to cause very similar blocking control / train recognition issues. It was on reduced capacity for months after opening and had the manufacturers on site for most of the first season trying to finally fix all the issues. This won't be something where it has to be done by 8th July so will suddenly come together no matter what - if they can't get it together, they can't...