^It will be better than that of Tigris. It's going to have 2 trains. The ride is also not very long either. If they get their loading procedures down, they should be able to have one train loaded and moved to the switch track by the time the other hits the final breaks. Honestly, I think this could work with 3 train ops since there is the sliding switch track (which would be it's own block). I'm assuming however there won't be enough block brake sections/legnth at the end in case they stack.