Ok so I rode the ride twice today and it was a hot mess. First let me say everything looks great and new. Nassal did a great job on that side of the ride. Now the rest of the ride was not so great. Here's a list of things I noticed but I'm sure most of these will be fixed in the coming days.
1. The gates aren't working...still.
2. The volume of the Ultrasaur narration was so loud it could be heard from the first drop.
3. Ultrasaur has timing issues and goes off way to early.
4. The Psittacosaurs weren't moving.
5. The Stegosaurus on the right wasn't making any sounds.
6. The most interesting thing though was there were 2 different narrations going on at once in the Stegosaurus scene. Which confused the heck out of me and everyone else in the boat.
7. The Raptor crate dropped before the boat even gets under it.
8. There was no sound at all when the Trex scratches the door.
9. And finally no right arm for Tiff and it's extremely noticeable as the child next to me pointed out.