what will the 5 acre expansion be used for?
I think we really need to look at what the park is missing to get an idea of what is coming.
Throwing an idea out there, build a smaller volcano with something similar to Disco H20 inside it.
what will the 5 acre expansion be used for?
I think we really need to look at what the park is missing to get an idea of what is coming.
Throwing an idea out there, build a smaller volcano with something similar to Disco H20 inside it.
This park is entirely ProSlide. And ProSlide is doing the install.Because Universal always goes with the lowest bidder, which leads to things like drive tires on Gringotts and last minute patchwork on waterpark technology that's been around for almost a quarter century. This *clap* Always *clap* Happens *clap* lolol.
THANK YOUThis park is entirely ProSlide. And ProSlide is doing the install.
Oh, and ProSlide is the planets premier water park supplier and far from the "lowest bidder".
Because Universal always goes with the lowest bidder, which leads to things like drive tires on Gringotts and last minute patchwork on waterpark technology that's been around for almost a quarter century. This *clap* Always *clap* Happens *clap* lolol.
I'm sorry but you should never go to a brand new theme park in the first week let alone month. It's just like a new resturaunt. But bigger. I agree that they maybe should have had an extra week or so before opening though. Because if they don't cover up some still with plants or fake wood I'm gonna be crushedThis is going to be a PR disaster. I'd demand a refund if I were going the first week. Can't believe they are still going through with that opening date.
I know I'm being really negative but this is an ugly situation. They still have like 8 days left but idk.
They are indeed the best. Love their attractions.This park is entirely ProSlide. And ProSlide is doing the install.
Oh, and ProSlide is the planets premier water park supplier and far from the "lowest bidder".
Because Universal always goes with the lowest bidder, which leads to things like drive tires on Gringotts and last minute patchwork on waterpark technology that's been around for almost a quarter century. This *clap* Always *clap* Happens *clap* lolol.
This park is entirely ProSlide. And ProSlide is doing the install.
Oh, and ProSlide is the planets premier water park supplier and far from the "lowest bidder".
ps blimey just noticed film release date too - is that VB opening day!?re Moana - Dwayne Johnson could lifeguard;
View attachment 4441
I not relating tagline to VB - I think is amazing what they have achieved in the time
They could even add a Yeti for laughs.
Also for the expansion, I would also like to see a smaller volcano, maybe 100 feet. But I would like to see some a New never before seen waterslides, toilet bowl, a fast paced lazy river, and I think you could probs fit another water coaster in there
re Moana - Dwayne Johnson could lifeguard;
View attachment 4441
I not relating tagline to VB - I think is amazing what they have achieved in the time
View attachment 4442
There's a lot more room there than I expected.
View attachment 4443
I count 7 acres. Wet n Wild was 11 acres (Not including the lake) to put that in perspective.
Bamboo screens, we all know how Uni likes SCREENZZZZZI'm sorry but you should never go to a brand new theme park in the first week let alone month. It's just like a new resturaunt. But bigger. I agree that they maybe should have had an extra week or so before opening though. Because if they don't cover up some still with plants or fake wood I'm gonna be crushed