Although....if only ONE ride room is giving them issues, then I still think they can soft open on time and give a head start to the operations team! After all, the double capacity we have and the two ride room configuration we have was designed to eliminate this issue of having DM fully down! Even with longer wait times, I think having at least one working side open would benefit the operations team.