Ripsaw- Retheme (Spongebob)
all of LC- Replace (Zelda)
FFL- Replace (MoM)
Mummy- Refurb (Please, please, please)
MIB- Refurb
Shrek- Replace (SLoP)
Also KZ. Like all of KZ- Replace (Pokemon + Small Trolls area)
And no reason a ton of this couldn’t start very soon. It’s just a matter of will and budget to get these parks completely fixed.
Ripsaw could start this September (unless JP goes down this September, then Ripsaw could go down Sept 2019).
LC could start in 2020 after HP and JP.
FFL could start immediately. The fact it hasn’t is mind boggling- it’s not like they’re losing anything.
Shrek could start immediately (I believe the entrance of the park takes priority even over Kidzone).
Concurrently refurb MiB or Mummy in alternating offseasons.
KidZone can start after SLoP or MoM w/ Trolls opening a year before Pokemon.
And for precious ET- I agree- it doesn’t really *need* a refurb compared to these other attractions. But if they’re feeling nostalgic, they can bring it to its full glory with a nice off-season refurb after MiB or Mummy. I genuinely wish they’d bring a ride down every offseason for 3-4 months so that nothing ever gets neglected (unless it’s on the chopping block)
And don’t forget about my dream to trump all dreams of Simpson’s being replaced with an actual dark ride. Throw that in after Pokemon also. :bored:
Imagine what UOR would look like in 2023 if that all happened in addition to their third park opening.
The unfortunate truth is we’d be lucky if half of it happens- but it’s still fun to dream