and they have new traffic signs up about one side of the street being closed. do you all think they are going to shut the whole road down during this process and only depend on the other entrance to the lots or are they going to do one half now (leaving one lane of traffic open) then when the bridge is done, do the other? I'm also wondering if they are going to go with one solid bridge, or do two separate one with a small gap in the middle like they did the other ones.