I issued a stop work order for project 609 for the super flat slab work being performed. A section of the slab was poured wothout the minimum required inspections being scheduled or performed by Threshold or this building department. Do not proceed with any additonal slab pours without resolution for this work that was poured without inspection. For compliance and approval from this department. The contractor must provide a third party verificaion by approved method to verify that the work done without inspection is in place and approved by the threshold inspector and the engineer of record for the structural work in place.