Tying into that more information and plans for the two hotels opening in first phase:
I know i posted the Nuo hotel plan before but finally has the Universal Beijing Hotel plans been released.
The 16.27-hectare Universal Hotel (including the front square) will be opened this year. The first phase of the hotel will build 800 rooms to create a four-star movie-themed hotel.
Original plans according to Xiao Bian (Batong.com: bjbato) learned that the project's originally covered a total area of 5.64 hectares. The area announced now is 188% higher than that at the time!
The Universal Hotel features rooms for hotels and hotels, including guest rooms, lobby and public rooms, logistics and equipment rooms, and motor garages and civil defense projects. According to the early estimates, the staff will reach 750 and the maximum passenger capacity will reach 1600. The increase in the total size of the land may mean that the total capacity may exceed the above figures.
There are urban roads and global theme parks on the north side of the base, and natural water systems in the southwest. The whole base is north high and low south, the southwest side is the main pedestrian road to enter the global resort area, the west side connects the main road service road of the scenic spot, the east side passes a landscape bridge, adjacent to another five-star hotel, the south side of the hotel The entrance plaza is a circular landscape plaza. Ticket booths are set up on both sides of the square. After the tourists purchase tickets, they are guided by the colonnade of the two wings of the hotel and enter the global park through the street.
The Nuo hotel next door covers an area of 9.01 hectares. In the first phase, it will build 400 rooms to create a five-star hotel with Chinese cultural characteristics.
It is planned to construct an underground building area of 48,527 m2 (above ground), and a 59,593 m2 building area (above ground) index is reserved for the second phase of the project. The project consists of two multi-storey towers and supporting podiums. The hotel room area is located on the west side of the site. It is divided into the north and south buildings, with 6 floors above ground. The building function is for hotels and hotels. The staff will reach 650 and the maximum passenger capacity will be 800.
This is how the interior is expected to look like