As short as it is, capacity is going to be bad regardless. You are going to be about through the whole thing before the next car is loaded. Add in a stop in the middle and sheesh. Station is same side load and unload and looks too short for continuous load. Maybe if they have a show scene right outside the station to kill some time and add another block, they could pull off a second scene/block at the midcourse launch. So maybe 1 car at load, 1 at first show, 1 at second show, 1 at unload. 20-30 seconds per block? 120-180 cars cycle per hour. Not sure what we are looking at for trains on this, but am assuming 1-2 car trains. So it's not going to be great, but could be not horrible.