Going back to this real quick. Looks like they tapped into a 36" water main coming out with 16" pipe to supply VB with water. I would guess the initial fill would be fresh potable water and not reclaimed water from the retention ponds, just a guess on my part. There may ave been a 12x6 tap connecting to existing reclaim service but wouldn't think 6" would be larger enough to move that much water. Again all speculation on my part since i have no idea how water systems work with water parks but do have experience with other forms of water systems
With pipe that massive they could probably fill the park faster than we think. Also
@UK-Trigg you can guarantee the what ever municipality supplies water to them has a meter on that sucker, lol. That is their cash register.