Do we have a checklist of what else all needs done?
- Back of the volcano.
- Trees trees trees trees
- Yellow slide with the gysers
- Tallest drop slide
- Remove slide plastics
- Sand on the beach
- Massive tidy up
- Clean the waters
I'm guessing there's more but I still think there's a good chance 99% of everything will be ready.
Looking at the pics, the back of the Volcano is done IMO. They are still building steps, but I can't see anywhere they have anchor points to add more rock.
Trees are easy with more people.
I think they've been testing the yellow slide. The geysers are a question mark, but I don't see that taking more than a week to fix.
They've had water in the tallest drop slide for a while. Is there something suggesting it's not done?
Ride plastic covers take a day tops to remove.
They could sand the whole place in a couple days if they needed to.
Tidying and detail work can take time. without knowing the final product's appearance its hard to say what they have left.
Water cleaning, and specifically the lazy rivers couldn't take too long as long as everything is functional.
Other things:
They still have roofs to finish on that group of 4 buildings on the north side. I'm not sure what those are. Maybe picnic shelters? Either way, they can have that finished in a day of two if totally necessary.
Still got to assemble all of the beach furniture. Won't take long but still.
I wonder if they are going to put walls, either hard or just cloth, on the cabanas. I can't see them being left in their current open on all sides state.
They are still doing rockwork in the kids area. Looks like its close to done though.
Theres a bunch of random projects going on. Nothing individually that takes long. They just need to throw manpower at them to get them done.
The big one is testing and problem fixing. We don't know if they've had problems with systems testing. That would be the only thing that I could see be a problem a month from now. Otherwise, I don't see anything concerning me for a company like this to complete on time. This isn't a government bid project that you'd expect overruns and delays on. This is a motivated company willing to spend money.