Anybody else see a big gate?
Definitely.
Curious. I assume this going to be the Gringotts exit area..
Anybody else see a big gate?
Anybody else see a big gate?
Can anyone zoom to potential hinges?
I tried, resolution is not high enough.
I meant, in the future, with a high powered camera lens. I have been working in Photoshop since it was first released. :thumbs:
Ok, sorry. I tried to "zoom" using PhotoZoom Pro 4 with no luck.
Wish I could take a live zoom shot. :wave:
Ok, sorry. I tried to "zoom" using PhotoZoom Pro 4 with no luck.
Wish I could take a live zoom shot. :wave:
Nassal built them. I saw them through an open doorway at Nassal the other day.BTW, are the windows they are installing custom or off the rack? They look kind of off-the-rack, which is surprising to me.
I may have missed it but has anyone found out more info on the so called Goblin area of Diagon Alley? The one depicted in the photo above ^? I was just thinking about this and realized that if there needs to be a kid area in the new wizarding world then I guess a Goblin area would be perfect and one must assume that they would live close to Gringots, right? Makes sense to me even tho this isn't mentioned in the books.
BTW, are the windows they are installing custom or off the rack? They look kind of off-the-rack, which is surprising to me.
So, this is kind of breaking redesign news. Many of you here have likely seen the backstage photos of the HE train cabins with the big bump sticking out of one side to accommodate some kind of 3D wizardry. I estimate the depth of those odd bumps to be 4-5 feet beyond the train cabins normal dimensions.
Weeeeeell... looking back at some nefarious digital photos of "things", none of the loading platform buildings, most importantly Kings Cross, was originally designed for that huge bump we see now. The trains were all quite standard widths in said "things" and were set to be maybe 6-12 inches from the opposite wall in the station.
So, each of the stations had to have been reeeee-engineered to handle the additional width of the final solution to the trains biggest effect. I would imagine that the redesigns or modifications happened 4-8 months ago but it might have been longer.