This issue is, that early WIP look at the accurate Rex you pictured is all the further it is currently - so it wasn't ready in time for the ride.This is an image from behind the scenes of Jurassic World Live's T-rex, its on model from Stan Winston Studios. I believe this is the same company who is creating the animatronics for the new ride! As we all know theme parks love to create double of things. So if a T-rex is being made for the live tour, why not make two?
View attachment 9734
Now THAT sign looks like something from the movie!At Universal again today. TMs once again are saying they’re hoping to roll out things “before the 4th of July”, so hopefully that means mid to late June. Also took some pics of a newly placed Raptor encounter sign.
Final Drop Animatronics have not been delivered yet.
Construction walls are coming down June 11th.
Final Drop Animatronics have not been delivered yet.
Expecting Late June Soft Open.
New JW TM's began training today.
Will the final drop animatronics be airlifted by a helicopter into the show building like they were back in '96? Maybe we'll get a glimpse of them in the coming weeks...
Works for Spielberg.Just load them in a boat and make sure to hit the brakes before it gets to the drop. lol
I have a feeling they have already been installed when they had a huge hole in the building.Will the final drop animatronics be airlifted by a helicopter into the show building like they were back in '96? Maybe we'll get a glimpse of them in the coming weeks...