darkridelover
V.I.P. Member
- May 5, 2012
- 1,801
- 2,975
Will this have continuous loading conveyor belts? That would increase dispatich times and capacity.Unloading, loading, and restraint checks take longer than 42 seconds on average and you never gain ground if you do manage to turn a train faster than 42 seconds in the station. 1600-1700 would be good.