Based on the recent pics that show that the lots have been paved over and they are staging trucks on them, I can't see them going vertical within two months. Possibly starting work by the end of the year, but not rip out the blacktop, dig footers, pour concrete, and then start standing steel. Just not enough time to get to that point even if the underground utilities are already done.