I'm confused as to what the actual issues are. Are they:
1. Running 12 trains period.
2. Running 12 trains with longer stoppages for loads/off loads, therefore getting the trains out of rhythm?
3. The weight of the trains with bodies in them screws with the ride itself?
I'm just confused at this point LOL