I would be down with Tokyo but that would mean one thing and one thing only would HAVE to be there....gojira :happy: :doggie: :drool: :faint: :died:
		
		
	 
I'd rather World Expo become Tokyo and a San Francisco-based Godzilla ride come to Disaster's spot :thumbs: with Fear Factor NOT going to more Potter (Tokyo instead)
And a guess as to how a blue sky USO timeline would work
June 2014: 
Potter 2.0 opens
Announcement of water park/monorail/CityWalk phase 2/5th hotel plans 
Major Kong construction begins 
September 2014: 
Barney, Fievel, Curious George :blank:, the StarToons Stage, KidZone Pizza and Nuthouse Coaster all go under the knife :saw: 
E.T. goes down for a massive refurb/upgrade. 
Animal Actors will also get a new show during this downtime. 
Water park construction begins 
November 2014: 
New Animal Actors show premieres
March 2015: 
KidZone Pizza replacement opens (possibly Krusty Krab Pizza) 
New parade for USF
CityWalk Phase 2 complete 
E.T. reopens with its massive refurb/upgrade including brand new AAs, projection effects, the same old forest queue smell 

, and a Potter-level facade
June 2015:
Kong E-ticket and mini-land 
New nighttime shows for IOA and USF
New interactive Gardens of Allah walkthrough 
Construction for JP expansion (family coaster, JPRA upgrade, Camp Jurassic expansion, dino AAs throughout island and Discovery Center dark ride) begins 
September 2015:
Hotel 5 complete 
November/December 2015:
All new KidZone opens (trackless AA-laden dark ride, family Splash Battle, family coaster, 2 flat rides, a show, and a play area) 
Disaster closes down for Godzilla replacement
March 2016: 
Water park opens 
Hotel 6 is announced 
Monorail begins soft opening 
June 2016:
Godzilla replacement opens
JP expansion opens 
Construction walls go up in Seuss expansion plot 
September 2016: 
MIB goes under rehab for a Tokyo overlay
BMG bulldozed for SSFL 
Fear Factor is bulldozed for a Pokemon mini-land 

1F2FRFBF relocated to Sneetch Beach to make room for E-ticket
Seuss Trolley gets upgrade and becomes an all-age attraction 
January 2017:
Toon Lagoon closes down for massive upgrade 
Grinchmas soundstage officially annexed into IOA for year-round stage show 
Announcement of 4th gate (planned opening of summer 2020) 
Groundbreaking for Fast and Furious E-ticket begins (MIB/Springfield) 
March 2017:
Hello Kitty carousel and boutique opens on new Tokyo waterfront 
SSFL opens (Minion funhouse, mini-chairswings flat ride, and kiddie coaster) 
May 2017: 
MIB Tokyo overlay opens 
Hotel 6 opens 
New Pokemon mini-land opens
July 2017:
Toon Lagoon replacement opens (family dark ride, show, play area, river rapids, and an all new immersively themed E-ticket thrill coaster to replace Dudley) 
September 2017:
Shrek and Lucy both close for 2 to 3 level Omnimover dark ride 
December 2017: 
For this year's Grinchmas celebration, a Grinch family coaster has been opened on the expansion plot along with a permanent soundstage for Seuss. 
January 2018:
Lost Continent "shuts" down aside from Mythos for revamping 
March 2018: 
Great Hall restaurant added to Hogsmeade
Omnimover dark ride opens 
Hotel 7 construction begins 
June 2018:
Fast and Furious E-ticket opens (reaches 100 mph during cilmax
January 2019:
Hotel 7 opens 
some backstage space is reworked in Seuss
June 2019: 
Lost Continent revamp opens 
Details about 4th gate
January 2020: 
Twister and Mummy get upgrades 
June 2020:
4th gate opens with massive summary of what's been achieved over last decade
Lorax dark ride comes to Seuss