Glad to see the stand by times settling in at a fairly constant low wait. My original, pre opening, thoughts were that I'd be lucky to get one ride in during my vacation in mid November. Now I'm pretty confident that multiple rides will be achievable. It's good when there's no Fastpass, and capacity is at least average, and not low.