OK, I wasn't sure which intersection it was. If that's not it, then it looks like it will be a second access point for the construction crews. I know they've have dump trucks going in through there in the past week or two.I believe that the Kirkman connection will be to the east of gate U T1 - somewhere between U T1 and U T2.
Gate U T1 looks like it's on the wrong side of the power lines to be Kirkman.
I feel like the lakes are elevated and made of concrete, allows for more "control"Just curious, but in order to make those lakes in the center of the park, does the entire park essentially have to be elevated relative to the surrounding land (due to water tables) or can they just dig down without having to worry about it?
Probably a little of both. Opening those lakes up allows for a control structure which can eventually lower the local groundwater table, plus the excavated material is used to raise the site when they can. As long as you have a nearby positive outfall you can lower the local water table to the lowest adjacent grade.Just curious, but in order to make those lakes in the center of the park, does the entire park essentially have to be elevated relative to the surrounding land (due to water tables) or can they just dig down without having to worry about it?
The Seven Seas lagoon was dug out, and then filled with water from Bay Lake. EPCOT's lake was actually dredged outJust curious, but in order to make those lakes in the center of the park, does the entire park essentially have to be elevated relative to the surrounding land (due to water tables) or can they just dig down without having to worry about it?
The Seven Seas lagoon was dug out, and then filled with water from Bay Lake. EPCOT's lake was actually dredged out
Mostly what they are doing is delaying the start of artisans like Nassal Co. Who would be starting to build all the theming elements.Driving past EU on Destination Parkway this afternoon it was heartening to see work going on. There was a dump truck and bulldozer hard at work on the giant mound, so I assume that means site prep is still happening, they're just holding off on going vertical on anything for a bit while the plumbing and other utilities are still being installed.
Mostly what they are doing is delaying the start of artisans like Nassal Co. Who would be starting to build all the theming elements.
Yeah that. But they have postponed starting on anything for EU.I’m assuming that they’re still working and maybe doing the rock work for the JP coaster?
Mostly what they are doing is delaying the start of artisans like Nassal Co. Who would be starting to build all the theming elements.
I finally got a Nintendo switch and I must say not having luigis mansion in EU is kind of A missed opportunity. During Halloween they could have like a kiddy version of horror nights during the day lol. Nevertheless I am excited for super Mario world.
For perspective reasons, guessing here, is where the track placement is currently, is that where the hub is, then directly to the left and right is Frankenstein's Village and the Ministry?