I'm sure you've all figured this out already, but obviously, Antojitos was NOT open for EVE, and as of Saturday, was not open yet. I have seen part of the interior, and I think it is beautiful, and that tile work on the ground outside and on the floor inside is spectacular, but I still hate the paint job.
The bell rings on the hour; they were testing it one morning a couple of weeks ago.