Hagrid’s Magical Creatures Motorbike Adventure Construction Discussion | Page 429 | Inside Universal Forums

Hagrid’s Magical Creatures Motorbike Adventure Construction Discussion

  • Signing up for a Premium Membership is a donation to help Inside Universal maintain costs and offers an ad-free experience on the forum. Learn more about it here.
Status
Not open for further replies.
Perhaps the spike will be semi-enclosed? Like maybe a cage of giant thorny plants around it?

nakima-tunnel-of-thorns-1-f3eec89a-22yl.jpg


Enough to obscure the views of the spike and the view from the spike.
 
Perhaps the spike will be semi-enclosed? Like maybe a cage of giant thorny plants around it?

nakima-tunnel-of-thorns-1-f3eec89a-22yl.jpg


Enough to obscure the views of the spike and the view from the spike.


YESS!!
I have been thinking this since the last round of aerials from Bio came out. A steel cage like the trellis at AKL? You can peep through like tower of terror.

Orrr they will put up four corner posts and string a giant screen between them over the end of the spike then project a creature that you fall back from. Hey, giving up the screennnzzz addiction is tough - take it one step at a time.
 
There's still A LOT of prefab rockwork coming to Fluffy's area, and that hasn't even begun.

The prefab work that goes around the spike is also meant to cross over the track for the last bit as well, blocking view of that maintenance building a little. If it was cut, something else will still need to be placed there.

Don't think it was cut though, as other prefab themed rockwork, vines, and fake trees are still not on site yet from other areas of the ride. Seems like last step stuff that can't be installed till after the pull through to me.
 
There's still A LOT of prefab rockwork coming to Fluffy's area, and that hasn't even begun.

The prefab work that goes around the spike is also meant to cross over the track for the last bit as well, blocking view of that maintenance building a little. If it was cut, something else will still need to be placed there.

Don't think it was cut though, as other prefab themed rockwork, vines, and fake trees are still not on site yet from other areas of the ride. Seems like last step stuff that can't be installed till after the pull through to me.
Slip or inadvertent? Not "rockwork" but work??:whistle::whistle::whistle:
 
Status
Not open for further replies.