Valravn as of last week has only 3 pieces of track left to fabricate. Mako still has a few more more to go but is expect to be finished by the end of the month and fully shipped to the park. Still was receiving track / supports last week, about 6 trucks came in. Hulk has been in production for only the last 2-3 months after having the other two rides ahead of it, but I do think you are correct on your timeline of March for Hulk with all fabrication.
Also in other news...Hulk went vertical (again)!
![]()
Wow, those shipping and fabrication end dates are farther out than I would have expected/was aware of. I was always under the impression the regional parks usually had roughly 80%+ of the ride on site by the time they start putting track up. With everything I saw for Mako between the Discovery Cove and Aquatica storage lots and not having seen any more track/support sightings I guessed that was done with. Ooops! Guess I need to keep a little more in touch with the folks back up in Ohio.
At the rate they're throwing supports back up they'll be waiting for more track to arrive. I will be very interested to see if they've tweaked any of the transitions or banking.