WWoHP was a special case and DWT...
I hope not. I don’t mind being stuck on that ride for a couple of hoursWWoHP was a special case and DWT... yeah I have no clue what was going on there. Regardless, it should be standard protocol with JW.
They could very well not have softs but if they want to learn from Orlando I sure as hell hope they do.
The latest JPland video shows a very brief look at the new area lighting up and running (at the 11:48 mark). It looks incredible!
Plus you can still hear the JP theme playing in the background - perhaps it's staying in some minor form?
Does anyone have any insight into this? More importantly, do we think the attraction will open with the ID?I know this is probably an error, but...
View attachment 9871
If that were the case, they wouldn't be saying summer 2019...
Until I hear something official FROM Universal, I’m not putting any stock in any “friend of mine” or “my Uncle, who’s a TM” or even “I’m a TM and this is what we were told”.
Doubtful. Prep work was being done even before the attraction closed for the new additions. Specifically for the IR within the show building.Does anyone have any insight into this? More importantly, do we think the attraction will open with the ID?
I know this is probably an error, but...
View attachment 9871
If that were the case, they wouldn't be saying summer 2019...
I'm just posting what I am hearing. Apparently they are using a place holder for the IndoRex. Hearing a November delivery. You don't have to believe me, but look at my previous posts and see my track record.
Well, that ain't right, sooooo....