Thought I would give you some insight into the term "concrete pits". I have never seen such complex grading for a single building. Below are the submitted water management plans. The blue outline is the show building (based on a not shown drawing from the same plans). The darkest gray lines side by side show grading height changes, 5-7 feet in difference overall. Note that it is inside the building. Wild.