Let’s go back to 2019… when they last installed the MiB tent.
And there was permit for installing the tent.
And there was permit for installing the tent.
Have we seen any permit for that site?That puts our total to 6 permits and 5 house permits. The first MiB Permit was for the tent install.
The MiB tent is worded differently. This is most likely due to the nonpermanent nature of that tent. An interior build-out is the interior alterations done to a building shell.
Going back to my wiggle room:
We are watching for 4 or 5 more permits. As I said the descriptions give room to hide things. 1 permit has been previously pulled for two houses located inside the same building. We may only see one permit for the SS, most likely 24, that holds two houses.